Reference Projects

KMG: Ridges Iron Ore: Wyndham Barge Loading Facility

Above: KMG: Aerial photo of site showing overland/over water conveyor installed over inter-tidal waters (differential settlement was a key design parameter)

BHP: Appin Area 9: Coal Clearance System

Owner: Kimberley Metals Group

Project Type: Design, Supply, Install, Commission

Timing: 2011

Value: $15M

Scope: Design, supply and  installation assistance package for greenfield 1755tph barge loading facility site, incorporating: jetty overland conveyor, pivot conveyor, substation and control system.

 

Significant design criteria: The pivot conveyor was particularly challenging, with the head end positioned on a pontoon capable of moving significantly in all directions, loading into a rotating hopper and having to accommodate an 8.5m tidal range and withstand cyclonic wind conditions.

 

Design of the CV01 jetty conveyor was also very challenging in terms of the footing design for the intertidal zone land and the overwater section. Management of differential settlement was paramount in ensuring system performance did not erode due to environmental conditions.

 

 

 

Client: BHP 

Project Type: Coal Clearance System

Completion: 2014

Value: $40 million

Scope: Design, manufacture and supply of four underground conveyor systems. An underground ‘sizing & splitter transfer station’ capable of joining three existing coal mines and enabling coal divergence from Mine A to either the coal preparation plant of Mine B via the Mine B conveyor clearance system and winder, or the Mine C coal clearance system and drift conveyor. Project managed as a complete package with NEPEAN Conveyors.

Supplied all pulleys, belt magnets and conveyor drives for the complete coal clearance system.

FMG: Anderson Point Facility: AP5 Project

Client: Fortescue Metals Group 

Project Type: Iron Ore Loading Berth

Completion: 2014

Value: $1.3 million

Scope: Supplied 19 conveyor pulleys for the fifth iron ore loading berth at Anderson Point Facility.

Bechtel/BMA: Hay Point Coal Terminal Expansion (Stage 3 - HPX3)

Client: Bechtel /BMA

Project Type: 244 Pulleys for the Hay Point Coal Terminal

Completion: 2014

Value: $12 million

Scope: This project involved the manufacture of 244 conveyor pulleys for the Hay Point Coal Terminal. This product will play an integral part of the conveyor installations, some of which includes a new berth and new overland conveyor.

Atlas Iron: Port Hedland: Utah Point Expansion to 15mtpa

Client: Atlas Iron Ore

Project Type: Turnkey

Completion: 2013

Value: $15M

Scope: As part of a NEPEAN turn-key project NEPEAN supplied pulleys, conveyor drive units as well as the Belt Magnet for the expansion project.

Above: Altas Iron overland conveyor magnet station

Worley Parsons / Fortescue Metals Group: Pilbara Iron Ore 2nd Outloading Circuit and T155 Project

Client: Worley Parsons / Fortesuce Metals Group

Project Type: 147 conveyor pulleys which play an integral part in the 155 MTPA loading
capacity.

Completion: 2012

Value: $7M

Scope: The project was the second stage of infrastructure works in the Pilbara for FMG.
The project involved further expansion at the Anderson Point Port and developments at Christmas Creek Mine. The works included a further 147 conveyor pulleys which play an integral part in the 155 MTPA loading capacity.

Laing O'Rourke: Ports Corporation of Queensland: Abbot Point X50 Expansion

Client: Laing O’Rourke / Ports Corporation of Queensland

Project Type: 147 conveyor pulleys which play an integral part in the 155 MTPA loading
capacity.

Completion: 2010

Value: $1.8M

Scope: The project involved works at Abbot Point Port to assist in doubling their output. NEPEAN completed the manufacture of conveyor pulleys for the X50 Onshore Works supplying 37 pulleys.

Laing O'Rourke: Ports Corporation of Queensland

Client: Laing O’Rourke / Ports Corporation of Queensland

Project Type: 147 conveyor pulleys which play an integral part in the 155 MTPA loading
capacity.

Completion: 2010

Value: $1.8M

Scope: Design, supply and manufacture 18 units/500KW TPKL conveyor drive units as well as dewatering and magnet stations as part of a total coal clearance system containing 4 conveyor systems.

Whitehaven Coal: Narrabri Coal

Client: Whitehaven Coal

Project Type: Design, construct, manufacture and install drift and skyline conveyor

Completion: 2010

Value: $15M

Scope: Design, construct, manufacture and install drift and skyline conveyors for complete seam to surface system solution for 4800tph. The project incorporated complete conveyor systems under an EPC contracting arrangement, which utilised 3 x 1000KW and 1 x 355KW VVVF conveyor drive units and Cross belt magnet stations as part of the package.

Idemitsu: Boggabri: Coal Terminal Upgrade

Above: Overview of the BCTU site

Client: Idemitsu Resources Australia

Project Type: Turnkey - Fixed Price Design and Construct

Timing: 2010

Value: $20M

Scope: Design and construct 1500tph stockpiling system including: conveyors and pulleys, radial stacker, feeders, unloading station, loadout station, roadways, HV substation with PF correction, control system, dust control and earthworks.

 

Ramp conveyor included covered gallery discharging onto 20,000m3 ROM coal stockpile. Project included civil design of footings and slabs and reduced speed conveying operation during development phase of operation.

Xstrata Coal: Blakefield South 

Client: Xstrata Coal

Project Type: Complete coal clearance

Timing: 2009

Value: $25M

Scope: Design, supply and install Complete coal clearance system including development gear including 63 conveyor pulley for this project.

Pilbara: Port & Mine Pulley Team 45, The Pilbara Iron Ore and Infrastructure Project

Client: Worely Parsons

Project Type: Supply pulleys

Timing: 2008

Value: $4M

Scope: Supply 137 conveyor pulleys towards this project

Mittal Steel: Assmang Iron Ore: Khumani Overland

Client: Mittal Steel

Project Type: 8km Overland Conveyor System

Timing: 2008

Value: $15M

Scope: Design supply and install 8km overland conveyor system delivering secondary crash ore

Aurecon Hatch / Ports Corporation of Queensland: Abbot Point X25 Expansion

Client: Aurecon Hatch / Ports Corporation of Queensland

Project Type: Abbot Point X25 Expansion

Timing: 2009

Value: $2.5M

Scope: The project aimed to increase the Abbot Point Port through to 25 MTPA. The works consisted of 78 conveyor pulleys for the new in-loading system to the stockyard and upgrading of the existing out-loading systems.

Vale: Carborough Downs: ROM Stockpile Conveyor + Underground Coal Clearance System

Above: Drift conveyor with ROM stockpile

Owner: AMCL (now Vale)

Project Type: Design + Construct

Completion: 2006

Value: $25M

Scope: Design and supply entire coal clearance system on greenfield site,including: 2500tph 1200mm ramp conveyor / cross conveyor / eastern mains conveyor. Development phase =1600tph. Full production =2500tph

 

Ramp conveyor included covered gallery discharging onto 20,000m3 ROM coal stockpile.  Project included civil design of footings and slabs and reduced speed conveying operation during development phase of operation.